D-01.10
Report including the description of tasks carried out and technical progress for the METROFOOD-PP project (GA n° 871083) at Month 24 (1st June 2021 – 30th Nov 2021), with a specific focus on the activities performed in the last six months (Month 19-24).
The report is aimed to the internal quality control of the project, including controlling and monitoring of work package status measured against deliverable and milestone planning, as well as quality and consistency with respect to technical and contractual requirements. An evaluation about main critical points encountered or envisaged and a re-examination of the main risks with related contingency plans (other than - if needed - deviations from the work plan and incidents) were also made. Plans for the next six months, until the project end, are specified.